HIGHLIGHTS:

  • Genus has been awarded Kwinana Battery Energy Storage System Two (KBESS2) Civil and Electrical Balance of Plant
  • Contract for KBESS2 Civil and Electrical Balance of Plant works approximately $90 million
  • KBESS2 will be Synergy’s second lithium-ion, large scale battery energy storage system, and the largest, in the South West Interconnected System (SWIS)
  • KBESS2 will connect to the 330kV Western Power transmission system via existing infrastructure at the adjacent KBESS1 site

231121-GENUSPLUS-AWARDED-SYNERGY-KWINANA-BATTERY-ENERGY-STORAGE-SYSTEM-STAGE-2

Leave a Reply

Your email address will not be published. Required fields are marked *

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock